Northridge Avenue

Our work at this home on Northridge Avenue, Toronto begun in the spring of 2017. The owner had the old concrete retaining wall that surrounded the whole front lawn taken away and the ground leveled, then added a layer of new sandy topsoil and had the driveway and walkways redone. We created a drainage trench along the street edge and filled it with riverstone to catch rain and soil runoff. The owner also dug up his tulips before construction and replanted them afterward in empty spots.

Before

After

3
4
5
6
7
8